Under the surface.
A new month, a new client and I was back in my high viz and heading for South Mimms. EPS trenchless installations are specialists in drilling for civil engineering, utilities and construction. My job was to document their work in photography and film which was a first for me so great to have a new challenge! The team really know their business. Precision is obviously key so they need to take their time. Plus there are so many variables in the equation. In this instance there were several trees with preservation orders and even the roots need to be avoided.
I spent two days on site, including breaks in the mess van so very much part of the crew. Thanks to Darren and the team for a great job and to web developer Gavin at Inhouse media for the recommendation. Can’t wait to see the pictures on the new site!